Answers on products, services, supply and support across construction, IT and solar.
Selection depends on cement type, desired slump, strength, weather and placement method. Share your mix details and we will suggest a suitable option.
Trial mixes are recommended before large-scale use to confirm compatibility with your cement and aggregates.
Yes. Packing options and bulk supply can be arranged according to requirement.
Dosage depends on the product, cement and desired performance. The manufacturer's technical data sheet and site trials guide the final dosage.
Compatibility can vary. A trial with your cement and aggregates is recommended.
Yes. Contact us with the product you are considering and we will share the available documentation.
Normally as soon as the surface water has disappeared after finishing. Follow the product data sheet for exact timing.
Some compounds can affect adhesion of later coatings. Tell us your finishing plan so we can recommend a suitable type.
In many cases yes, with proper surface preparation and a suitable adhesive. Share the details of the existing surface.
Coverage depends on tile size, trowel notch and surface evenness. Tell us your area and tile size and we will estimate.
Polymer modified or epoxy grouts are usually preferred in wet areas because of lower water absorption.
Wait for the adhesive to set as per its data sheet, usually 24 hours or more depending on conditions.
Flexible coatings or membranes are usually used on exposed terraces because they handle movement. A site check helps confirm the right system.
Yes. We can supply material alone or supply with application.
SBR latex is commonly used in polymer modified mortars, but a proper waterproofing system is recommended for critical areas.
It depends on the grade. Share the gap size and we will suggest a suitable product.
Follow the data sheet; early strength grades allow faster commissioning.
It needs more care than cement grout, especially cleaning. Trained applicators are recommended and we can provide this on request.
It is not designed for moving cracks. These need flexible treatments such as injection or sealants.
Typically two coats, with the exact system following the manufacturer's data sheet.
Yes. Loose rust must be removed to a suitable standard before coating.
This is not recommended because it can stain concrete and cause adhesion problems with later finishes.
It depends on movement and the product. Share your joint details and we will recommend a suitable sealant.
It depends on the affected area, source of water entry, surface condition and project requirement. A site assessment is recommended.
Yes. Terrace and roof waterproofing is one of our core services, depending on site condition and required treatment.
Yes. Suitable products can be sourced from available brands and suppliers.
Site inspection can be arranged depending on location and requirement. Contact us with your project details.
It depends on area, condition and system. Surface preparation and curing time are important parts of the schedule.
Yes, if the concrete is sound, dry and properly prepared.
Anti-slip finishes are available for wet or ramp areas.
Epoxy suits general industrial use, while PU is chosen for thermal shock, impact and certain chemical exposures. We can help you choose.
Specific PU mortar systems are designed for low temperatures and thermal shock.
Signs include cracks, rust stains, spalling concrete and exposed rebar.
Yes. Repair chemicals can be supplied alone or with application support.
Yes, PU injection grouting is commonly used to stop leaks even when water is flowing.
It depends on the cause of the leak and structural movement. A site assessment helps us choose the right grout.
It depends on sealant type, exposure and movement. Periodic inspection helps.
Light scratches can often be treated. Deeper damage may need polishing by specialised teams.
It depends on camera count, resolution and retention days. We calculate this during planning.
Yes, with internet connectivity and the right setup.
Yes. CCTV annual maintenance contracts are available.
Yes, many systems export data to payroll software. Share your requirement and we will suggest the right setup.
Cloud-based solutions can consolidate attendance across locations.
Yes. A coverage survey helps place access points correctly.
Yes, including splicing and testing.
Yes, AMC can cover systems purchased elsewhere after an assessment.
Yes, including user access, backup and security.
A typical business website takes a few weeks depending on pages and content.
Yes, all sites are built mobile-first.
It depends on the gate width. We take measurements during the survey.
Yes. CCTV, access control and alarms can often be integrated for better response.
Scope depends on the contract. Typically it includes preventive visits and repairs; parts may be extra or included.
As a rough guide, a kilowatt of solar needs roughly 8 to 10 sq m of shadow-free area. A site visit gives the exact figure.
Government schemes change. We can guide you on what is currently applicable for your category.
No, standard on-grid systems turn off during grid failure. Hybrid systems with batteries can provide backup.
It depends on type and usage. Lithium batteries usually last longer than lead acid.
Yes, because of batteries and hybrid inverters, but it gives backup power.
Typically design, procurement, installation, commissioning and documentation. Exact scope is defined in the contract.
It depends on load profile and available area. We study your bills and site.
Yes, after a quick site assessment.
Share your project details and our team will get back to you with the right solution.